INSP-Final Inspection | 11/2/2017 | 11/3/2017 | 11/3/2017 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Previous corrections have been made
|
INSP-Final Inspection | 10/19/2017 | 10/20/2017 | 10/20/2017 | A | FAIL |
Jim Page
|
|
|
Signal sync issue needs to be repaired. Smoke detector in the northeast corridor exit needs to be relocated to be 36 inches away from return air. Annual inspection needs to be completed on fire sprinkler system.
|