INSP-Final Inspection | 8/13/2019 | 8/13/2019 | 8/13/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for scope of work complete.
|
INSP-Final Inspection | 4/12/2019 | 4/12/2019 | 4/12/2019 | P | CANC |
Jim Page
|
|
|
Per conversation with my supervisor, Adele Schaffeld-Griffin, notes entered reading "Final fire sprinkler sign off of inspections for this permit will be completed at the same time as the life safety inspection is completed under the building permit." Please coordination with the general contractor to schedule the final inspections. Onsite inspection request for today will need to be rescheduled until coordinated inspections for the life safety can be scheduled.
Clarence Phone #: ###-####
|
INSP-Final Inspection | 6/29/2017 | 6/30/2017 | 6/30/2017 | P | PART |
Jim Page
|
|
|
Final fire sprinkler inspection for this permit is complete, permit will remain in issued status until construction for this permitted area is complete.
|
INSP-Sprinkler Rough-in/Hydro | 6/22/2017 | 6/23/2017 | 6/23/2017 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection complete, approved for cover. Hydrostatic test for overhead fire sprinkler piping complete.
|
INSP-Sprinkler Rough-in/Hydro | 6/14/2017 | 6/15/2017 | 6/15/2017 | A | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with Chris, request will be rescheduled for a later date.
|