INSP-Final Inspection | 6/19/2017 | 6/20/2017 | 6/20/2017 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in | 4/20/2017 | 4/21/2017 | 4/21/2017 | A | PASS |
Troy Cobbley
|
|
|
Remaining sprinkler piping is ok to cover
|
INSP-Sprinkler Rough-in | 4/20/2017 | 4/20/2017 | 4/20/2017 | P | FAIL |
Troy Cobbley
|
|
|
I stopped at the project site and did not make contact with Colton or with Pat. No inspection was performed.
Colton Phone #: ###-####
|
INSP-Sprinkler Rough-in | 4/19/2017 | 4/19/2017 | 4/19/2017 | P | CANC |
Troy Cobbley
|
|
|
Colten Cox ###-#### or Pat Palmer contractor ###-#### are the contacts for this inspection. They are requesting a rough to cover inspection for 1436 Allumbaugh #203 & #204. Another inspection was requested to see revised/approved plans. Thank you. Phone #: ###-#### >> Inspection requested via web by Kay Haney Inspection cancelled from web by: Kay Haney
|
INSP-Sprinkler Rough-in | 4/18/2017 | 4/19/2017 | 4/19/2017 | A | PART |
Troy Cobbley
|
|
|
ste 203 and 204 // Pat Phone #: ###-####
Apartments 203 and 204 are ok to cover. The four first floor apartments can not be covered until I can view the revised/approved plans.
|
INSP-Sprinkler Rough-in | 4/12/2017 | 4/12/2017 | 4/12/2017 | P | PART |
Troy Cobbley
|
|
|
The sprinkler piping in the upper apartments on the east, 201 and 202, are ok to cover and tenting has passed.
|
INSP-Sprinkler Rough-in | 4/6/2017 | 4/6/2017 | 4/6/2017 | P | FAIL |
Troy Cobbley
|
|
|
The city approved plans for the rerouted underground supply piping have been provided but they do not match the actual installation. Revised plans showing the actual placement of pipe need to be provided to plan review. Second floor piping is still not tented yet.
|
INSP-Sprinkler Rough-in/Hydro | 4/5/2017 | 4/5/2017 | 4/5/2017 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed.
|
INSP-Sprinkler Rough-in | 3/29/2017 | 3/30/2017 | 3/30/2017 | P | PART |
Troy Cobbley
|
|
|
A rough to cover inspection passed for the building but piping can not be covered until a tenting inspection has been performed and the underground supply piping reroute has been approved.
|