Permit Information
Permit NumberFIR16-00823
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 1436 N ALLUMBAUGH ST
Project NameAberdeen 5 Bldg "B-1"
Customer Number 
ePlanReviewYes
Description
[Aberdeen Phase 5 Building B-1]
The fire sprinkler scope of work consists of CPVC piping is being used with extended coverage residential sprinklers to protect a two level, eight-unit apartment building using NFPA 13R

The underground is under permit FIR16-00780

[BLD16-02649] – Permit for the construction of a new 8,028 sq. ft., two story building including 420 sq. ft. of common entry area and covered patios. The building is comprised of 4, 951, sq. ft. type B units on the first story and 4, 951 sq. ft. units on the second story with each unit accessed through a common entry area. The building is to be constructed per the approved plans and the attached engineering. The building is fully fire sprinklered with a NFPA 13R system for R occupancies. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/19/20176/20/20176/20/2017APASS
DetailsJim Page
Final fire sprinkler inspection passed/complete
INSP-Sprinkler Rough-in4/20/20174/21/20174/21/2017APASS
DetailsTroy Cobbley
Remaining sprinkler piping is ok to cover
INSP-Sprinkler Rough-in4/20/20174/20/20174/20/2017PFAIL
DetailsTroy Cobbley
I stopped at the project site and did not make contact with Colton or with Pat. No inspection was performed.

Colton Phone #: ###-####
INSP-Sprinkler Rough-in4/19/20174/19/20174/19/2017PCANC
DetailsTroy Cobbley
Colten Cox ###-#### or Pat Palmer contractor ###-#### are the contacts for this inspection. They are requesting a rough to cover inspection for 1436 Allumbaugh #203 & #204. Another inspection was requested to see revised/approved plans. Thank you. Phone #: ###-#### >> Inspection requested via web by Kay Haney Inspection cancelled from web by: Kay Haney
INSP-Sprinkler Rough-in4/18/20174/19/20174/19/2017APART
DetailsTroy Cobbley
ste 203 and 204 // Pat Phone #: ###-####

Apartments 203 and 204 are ok to cover. The four first floor apartments can not be covered until I can view the revised/approved plans.
INSP-Sprinkler Rough-in4/12/20174/12/20174/12/2017PPART
DetailsTroy Cobbley
The sprinkler piping in the upper apartments on the east, 201 and 202, are ok to cover and tenting has passed.
INSP-Sprinkler Rough-in4/6/20174/6/20174/6/2017PFAIL
DetailsTroy Cobbley
The city approved plans for the rerouted underground supply piping have been provided but they do not match the actual installation. Revised plans showing the actual placement of pipe need to be provided to plan review. Second floor piping is still not tented yet.
INSP-Sprinkler Rough-in/Hydro4/5/20174/5/20174/5/2017PPASS
DetailsTroy Cobbley
Overhead hydro test passed.
INSP-Sprinkler Rough-in3/29/20173/30/20173/30/2017PPART
DetailsTroy Cobbley
A rough to cover inspection passed for the building but piping can not be covered until a tenting inspection has been performed and the underground supply piping reroute has been approved.