INSP-Final Inspection | 5/3/2018 | 5/3/2018 | 5/3/2018 | P | PASS |
Jim Page
|
|
|
Annual inspection has been completed, final fire sprinkler inspection for area of work complete.
I believe the Fire Sprinkler annual Inspection is Complete per Jim Page. Please call Jeff Packham With Questions. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Final Inspection | 2/16/2018 | 2/22/2018 | 2/22/2018 | P | FAIL |
Jim Page
|
|
|
Observed on previous rough-in inspection for builing that annual inspection for fire sprinkler system has not been completed for a few years, annual inspection needs to be completed and tagged on fire sprinkler system before final inspection for this permit can be performed.
|
INSP-Sprinkler Rough-in | 4/11/2017 | 4/12/2017 | 4/12/2017 | A | PASS |
Troy Cobbley
|
|
|
2nd floor sprinkler piping ok to cover
|
INSP-Sprinkler Rough-in | 2/15/2017 | 2/16/2017 | 2/16/2017 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping on level 1 area of work complete, notated city approved drawings area approved for cover.
|