INSP-Final Inspection | 3/13/2018 | 3/14/2018 | 3/14/2018 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
|
INSP-Final Inspection | 3/2/2018 | 3/5/2018 | 3/5/2018 | P | FAIL |
Jim Page
|
|
|
Replace painted fire sprinkler heads. Fire sprinkler head under stair landing on bottom level needs to be raised. Provide fire sprinkler in small hallway going to pantry from kitchen as shown on approved drawings. Fire sprinkler head in south bedroom is 24 inches away from center of ceiling fan, a minimum of 36 inches from center is required. Provide means of irrigation isolation when flow switch activates.
|
INSP-Final Inspection | 2/22/2018 | 2/23/2018 | 2/23/2018 | A | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with Richard Clark Phone #: ###-####, inspection will be rescheduled for a later date.
|
INSP-Final Inspection | 2/21/2018 | 2/22/2018 | 2/22/2018 | P | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with Richard Clark Phone #: ###-####, request is rescheduled for 23FEB2018.
|
INSP-Sprinkler Rough-in | 12/8/2017 | 12/11/2017 | 12/11/2017 | A | PASS |
Jim Page
|
|
|
Garage approved for cover, garage needs to be a conditioned space due to fire sprinkler riser, piping and fire sprinkler heads in garage space
|
INSP-Sprinkler Rough-in | 12/4/2017 | 12/5/2017 | 12/5/2017 | A | PART |
Jim Page
|
|
|
Partial rough to cover inspection complete for overhead fire sprinkler piping/tenting complete, overhead fire sprinkler piping approved for cover with exception to the garage, tenting for the garage area not complete at time of inspection, overhead fire sprinkler piping in garage area cannot be covered until tenting insulation is installed and passed inspection.
|
INSP-Sprinkler Rough-in/Hydro | 11/7/2017 | 11/7/2017 | 11/7/2017 | P | PART |
Jim Page
|
|
|
Rough in inspection complete for overhead fire sprinkler, overhead fire sprinkler piping located between conditioned spaces approved for cover, piping located in attic spaces cannot be covered until tenting inspection is completed and passed.
|
INSP-Final Inspection | 11/7/2017 | 11/7/2017 | 11/7/2017 | A | CANC |
Jim Page
|
|
|
Wrong inspection request entered, this request is cancelled.
|
INSP-Sprinkler Rough-in | 11/6/2017 | 11/6/2017 | 11/6/2017 | P | CANC |
Jim Page
|
|
|
Inspection request will be rescheduled due to shceduling issues for inspection request.
|