INSP-Final Inspection | 6/1/2017 | 6/2/2017 | 6/2/2017 | A | FAIL |
Troy Cobbley
|
|
|
Need re-submittals showing the Break Room, Paint Mixing Room, Mechanical Room, Locker Room, Restroom...ect. Need shielded wire, document box, map, signage on door and to test devices and verify placement.
|