Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberFIR17-00067
StatusFinaled
Name TRIBAL FIRE SYSTEMS
Site Address 8000 S FEDERAL WAY
Project NameMicron Bldg 51 System 10-3
Customer Number 
ePlanReviewYes
Description
[Micron Building 51 - System 10-3 - C24074]
The fire sprinkler scope of work consists of part of the subfab area. The system is designed as a 4”x4”x 1 ½” grid with a looped primary main. The sprinklers are center in the intersections of the waffle ceiling. The system is designed based on OH II for 3000 ft² per IFC for Semiconductor H5. There is also an area protected by a side feed system.

• The underground is under permit FIR16-00701
• See addendum for graphic scope of work

Contractor’s Note:
The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.

[BLD16-03440] - For the construction of a new one story building with a basement for a fabrication and R&D facility to include related site work. The building includes a 149,327 sq. ft. basement, a 164,022 sq. ft. first story and a 33,638 sq. ft. equipment platform. This building is fully fire sprinklered and alarmed for H occupancy. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/7/20198/7/20198/7/2019PPASS
DetailsJim Page
Final fire sprinkler inspection for area of work complete.

Phone #: ###-#### Inspection requested via web by Jessia Maxwell
INSP-Final Inspection7/31/20198/1/20198/1/2019ACANC
DetailsTroy Cobbley
Canceling due to manpower shortage and time constraints. Please call Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
INSP-Final Inspection7/31/20197/31/20197/31/2019PCANC
DetailsJim Page
Rescheduled for 01AUG2019 per conversation with point of contact, this request is cancelled.

Please call Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
INSP-Sprinkler Rough-in8/23/20178/24/20178/24/2017APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping on systems 10-3, 20-7 and 20-11 complete, approved for cover. Notated the city approved drawings with green highlighter/red ink systems that were inspected.
INSP-Sprinkler Rough-in/Hydro8/23/20178/23/20178/23/2017PPASS
DetailsJim Page
Hydrostatic test for systems 10-3, 20-7 and 20-11 complete.