Permit Information
Permit NumberFIR17-00097
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 1401 S LUSK PL
Project NameResidence Inn Gatehouse Renova
Customer Number 
ePlanReviewYes
Description
[Residence Inn Gatehouse Renovation]
The fire sprinkler scope of work consists of providing a 4” wet system for the below protection and a 6” dry system for the attic. There are also a few concealed spaced sprinklers. The systems are supplied by a 6”x70’ ± C-900 underground main from the street through a 6” backflow preventer and header.


[BLD16-03241] – A fire sprinkler system will be installed in conjunction with this permit. The fire sprinkler system is used for story increase and for fire area. Demolition work includes removing an existing porte cochere (about 550 square feet), removing exterior walls, cutting back some existing roof eaves, and removing the roof covering. To expand an existing 4,088 square foot building by about 1,124 square feet to 5,212 square feet. Taking into account the demolished porte cochere, the net increase of building area is about 574 square feet. The remodeled area of the expanded building has a floor area of about 3,542 square feet. Work related to the addition includes concrete footings and foundations, concrete slabs on grade, a sunken floor area infill with gravel and a new concrete slab on top, two exterior trellises, exterior walls, exterior shear walls, exterior windows, exterior siding, cultured stone exterior wall finish, new roof structures, new beams and columns, new roof coverings, two existing restrooms upgraded to be accessible to the disabled, a warming kitchen, a direct vent gas fireplace, a dining area, millwork, and finishes. Cooking operations that create grease laded vapors are not allowed. Site work includes reconfiguring the existing swimming pool enclosure fence and gates, reconfiguring the accessible parking spaces and the curb ramps and sidewalks that serve them, creating a passenger loading zone, providing an accessible route from the public way to the main entrance, constructing a new trash enclosure, and removing an existing outdoor concrete spa and fence and providing new landscaping. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. A separate fire sprinkler permit and a separate fire alarm permit shall be obtained prior to beginning any modification or installation work on such system. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/1/20176/1/20176/1/2017PPASS
DetailsJim Page
Final fire sprinkler inspection passed/complete
INSP-Final Inspection5/30/20175/31/20175/31/2017ACANC
DetailsTroy Cobbley
Fire alarm system not ready so no testing was performed. I let mike know we will need a forward flush test performed.
INSP-Sprinkler Rough-in5/26/20175/30/20175/30/2017PCANC
DetailsTroy Cobbley
Mike Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro5/17/20175/18/20175/18/2017APASS
DetailsTroy Cobbley
24 hour air test for the dry system passed
INSP-Sprinkler Rough-in5/16/20175/17/20175/17/2017APART
DetailsTroy Cobbley
The four pendant heads in the lay-in tile areas as marked on the plans are ok to cover. Also the 24 hour air test was started at 8:45am with 44psi on the guage
INSP-Sprinkler Rough-in/Hydro5/16/20175/16/20175/16/2017PPASS
DetailsJim Page
Overhead fire sprinkler hydrostatic test complete for both wet and dry system.
INSP-Sprinkler Rough-in/Hydro5/11/20175/12/20175/12/2017PCANC
DetailsTroy Cobbley
Cancel per Mike Phone #: ###-####
INSP-Supply line flush5/5/20175/9/20175/9/2017ADONE
DetailsJim Page
Underground main line flush complete
INSP-Sprinkler Rough-in/Hydro5/5/20175/8/20175/8/2017PPASS
DetailsJim Page
Witness of underground hydro complete
INSP-Sprinkler Rough-in5/3/20175/4/20175/4/2017APASS
DetailsJim Page
Rough to cover inspection for undergournd supply complete
INSP-Sprinkler Rough-in5/2/20175/3/20175/3/2017PPART
DetailsJim Page
Partial rough to cover complete for underground, underground supply running from south to north approved for cover. Piping running from east to west to be inspected the follwing day, to include change of direction, in building riser and associated thrust blocks.
INSP-Sprinkler Rough-in4/13/20174/13/20174/13/2017PPART
DetailsJim Page
Area's requiring tenting above wet system piping complete, approved for cover.
INSP-Sprinkler Rough-in4/5/20174/5/20174/5/2017PPART
DetailsJim Page
Rough in inspection complete for wet system, tenting will be installed at a later date, notated city approved drawings with pink highlighter/red ink area's inspected. Partial inspection copleted on attic dry system, notated city approved drawings with pink highlighter/red ink area's on dry system approved for cover.