INSP-Final Inspection | 6/28/2017 | 6/29/2017 | 6/29/2017 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in/Hydro | 6/22/2017 | 6/23/2017 | 6/23/2017 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection complete, approved for cover. Hydrostatic testing for area of work complete.complete
|
INSP-Sprinkler Rough-in | 5/17/2017 | 5/18/2017 | 5/18/2017 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping/pendant heads above hardlids on level 1 complete, approved for cover.
|
INSP-Sprinkler Rough-in | 4/28/2017 | 5/1/2017 | 5/1/2017 | P | PART |
Jim Page
|
|
|
Rough iinspection complete for overhead fire sprinkler piping, rough to cover will be scheduled when finish pendant/arm overs are installed.
|
INSP-Sprinkler Rough-in | 4/27/2017 | 4/28/2017 | 4/28/2017 | A | CANC |
Troy Cobbley
|
|
|
To be canceled per Mike Martin
Phone #: ###-#### Inspection requested via web by Kay Haney
|