Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberFIR17-00159
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 1080 W AMITY RD
Project NameMETALCRAFT ADDITION
Customer Number 
ePlanReviewYes
Description
[Metalcraft Addition]
The fire sprinkler scope of work consists of addition to an existing warehouse. The system is designed as OH2 with a maximum storage height of 12. The new addition’s 2½” feed main will connect to an existing 4” feed main. The new addition is designed as a center rail grid with 1 ½” x 2 ½” x 1 ½”

5/05/2017 Plan Mod #1 - Changed design to 17’ high piled storage of Class II commodity

Location on Plan - Warehouse Addition
Commodity - Steel
Classification - Class II
Storage Type (rack, solid pile, etc.) - Racks
Pallet Type (wood or plastic) - Wood
Aisle Width - 8’
Height of Storage - 17’
Ceiling Height - 23’
Encapsulated - No
Solid Shelves - No
Smoke and Heat Vents - No
Draft Curtain - No
In Rack Sprinklers - No
Sprinkler Type - K=11.2
High Temperature Sprinklers Required - Yes
Applicable NFPA Section - T 16.2.1.3.2 F 16.2.1.3.2 (b) Curve E – F 16.2.1.3.4.1
Hydraulic Design Criterion - .244/2069 (130 ft² spacing)
Hose Stream Requirements - 500


[BLD16-02748] –Permit for 7,243 s.f. pre-engineered metal building addition to the existing warehouse facility. Special Inspections per 310 form attached. Scope of work to include minor demolitions as shown on the approved drawings. New pre-fabricated metal building and foundation with associated site work. Any racking installed over 8 feet will require a separate building permit. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/27/20176/28/20176/28/2017PPASS
DetailsJim Page
Final fire sprinkler inspection passed/complete
INSP-Sprinkler Rough-in/Hydro6/26/20176/27/20176/27/2017APASS
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping in area of work complete. Rough in inspection complete.
INSP-Sprinkler Rough-in6/7/20176/7/20176/7/2017PPASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping/sway brace restraints complete, approved for cover.