INSP-Final Inspection | 3/1/2018 | 3/2/2018 | 3/2/2018 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
|
INSP-Final Inspection | 10/18/2017 | 10/18/2017 | 10/18/2017 | P | PART |
Jim Page
|
|
|
Fire sprinkler inspection for TCO complete.
|
INSP-Sprinkler Rough-in | 9/25/2017 | 9/25/2017 | 9/25/2017 | P | PASS |
Jim Page
|
|
|
Ceiling changed in food prep area from an open ceiling to a drop in tile ceiling, rough in inspection for pendant heads that were added for the ceiling change complete, heads will be included on the as-builts. Approved for cover.
|
INSP-Sprinkler Rough-in | 6/20/2017 | 6/21/2017 | 6/21/2017 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for fire sprinkler piping located above hardlids in area of work complete, hardlids approved for cover.
|