INSP-Final Inspection | 8/24/2017 | 8/25/2017 | 8/25/2017 | A | PASS |
Troy Cobbley
|
|
|
permit finaled. Drawings were basic and did not match installation. I verified compliance in new scope of work and sync.
|
INSP-Alarm Testing | 8/23/2017 | 8/24/2017 | 8/24/2017 | P | CANC |
Troy Cobbley
|
|
|
Contact is Sean. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Final Inspection | 8/22/2017 | 8/23/2017 | 8/23/2017 | P | FAIL |
Troy Cobbley
|
|
|
Sync issue needs to be addressed as previously discussed.
|
INSP-Final Inspection | 8/21/2017 | 8/22/2017 | 8/22/2017 | A | FAIL |
Troy Cobbley
|
|
|
Notification needs to be modified in the new corridor system as discussed. No testing performed.
|
INSP-Final Inspection | 8/15/2017 | 8/16/2017 | 8/15/2017 | P | CANC |
Troy Cobbley
|
|
|
Contact is Morgan Phone #: ###-#### >> Inspection requested via web by Morgan Ahten Inspection cancelled from web by: Morgan Ahten
|