INSP-Final Inspection | 12/27/2017 | 12/28/2017 | 12/28/2017 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 12/18/2017 | 12/18/2017 | 12/18/2017 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Supply line flush | 12/18/2017 | 12/18/2017 | 12/18/2017 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 10/27/2017 | 10/30/2017 | 10/30/2017 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Tenting passed. Piping can be covered
|
INSP-Sprinkler Rough-in | 10/27/2017 | 10/30/2017 | 10/27/2017 | P | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in | 9/20/2017 | 9/21/2017 | 9/21/2017 | P | PASS |
Troy Cobbley
|
|
|
Underground supply piping can be buried.
|