INSP-Final Inspection | 1/31/2018 | 2/1/2018 | 2/1/2018 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 1/25/2018 | 1/26/2018 | 1/26/2018 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
INSP-Supply line flush | 1/24/2018 | 1/25/2018 | 1/24/2018 | A | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed
|
INSP-Sprinkler Rough-in | 11/16/2017 | 11/16/2017 | 11/16/2017 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Tenting passed. Piping is ok to cover
|
INSP-Sprinkler Rough-in | 11/14/2017 | 11/15/2017 | 11/15/2017 | A | FAIL |
Troy Cobbley
|
|
|
Resubmit plans showing all of the additional 90's on the first floor to verify that the hydraulic calculations still work. Also the plans need to be "mirrored" because piping and room layout is backwards. Also I'm requesting insulation to be installed below the piping in the garage and as per the general contractor he will do the installation. No piping can be covered.
|
INSP-Sprinkler Rough-in | 10/6/2017 | 10/9/2017 | 10/9/2017 | A | PASS |
Troy Cobbley
|
|
|
Underground supply line inspection passed. Piping can be covered.
|