INSP-Final Inspection | 12/8/2017 | 12/8/2017 | 12/8/2017 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 10/19/2017 | 10/20/2017 | 10/20/2017 | A | PASS |
Jim Page
|
|
|
Hydrostatic test for underground supply complete.
|
INSP-Sprinkler Rough-in/Hydro | 10/16/2017 | 10/17/2017 | 10/17/2017 | A | CANC |
Troy Cobbley
|
|
|
Not ready for a hydro due to a leaking flange
|
INSP-Supply line flush | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed
|
INSP-Sprinkler Rough-in | 10/11/2017 | 10/11/2017 | 10/11/2017 | P | CANC |
Troy Cobbley
|
|
|
Wrong permit called in for inspection.
|
INSP-Sprinkler Rough-in/Hydro | 8/31/2017 | 8/31/2017 | 8/31/2017 | P | CANC |
Troy Cobbley
|
|
|
Contact Brad Westbrook ###-#### 30 min prior to UG Hydro insp start please.
Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|
INSP-Sprinkler Rough-in | 8/10/2017 | 8/11/2017 | 8/11/2017 | A | PASS |
Troy Cobbley
|
|
|
The piping for the remote FDC has the tape installed and can be covered.
|
INSP-Final Inspection | 8/10/2017 | 8/10/2017 | 8/10/2017 | P | FAIL |
Troy Cobbley
|
|
|
Project is not ready for a final yet. Will need hydro tests and flushing. Todays inspection was for the remaining remote FDC piping/vault. Piping can be covered up to the FDC. The FDC need the wrapping as per Chapter 10 of NFPA 13 prior to cover.
|
INSP-Sprinkler Rough-in | 8/8/2017 | 8/8/2017 | 8/8/2017 | P | PASS |
Troy Cobbley
|
|
|
Todays inspection was for a portion of the remote FDC. Piping is ok to cover up to the vault location. Vault was not installed yet.
|
INSP-Sprinkler Rough-in | 8/4/2017 | 8/4/2017 | 8/4/2017 | A | PART |
Troy Cobbley
|
|
|
The underground supply piping is now installed deap enough and can be covered. The remote FDC piping has not been installed yet in the same trench. I will need another inspection scheduled prior to a complete cover inspection given.
|
INSP-Sprinkler Rough-in | 7/31/2017 | 8/1/2017 | 8/1/2017 | A | FAIL |
Troy Cobbley
|
|
|
The underground supply piping and the remote FDC piping do not meet the minimum 4'-6" bury depth as required per City Of Boise ordinance and Idaho State Fire Marshal requirements.
|
INSP-Final Inspection | 7/20/2017 | 7/20/2017 | 7/20/2017 | P | CANC |
Troy Cobbley
|
|
|
Contact will be Aaron Trimble please contact him 30 min. prior to Fire Final.
Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|