INSP-Final Inspection | 8/22/2017 | 8/23/2017 | 8/23/2017 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Conference | 8/11/2017 | 8/11/2017 | 8/11/2017 | P | DONE |
Troy Cobbley
|
|
|
Per my conversation with Scott Arellano, additional manual pull stations will not be required.
|
INSP-Final Inspection | 8/8/2017 | 8/9/2017 | 8/9/2017 | P | FAIL |
Troy Cobbley
|
|
|
Provide correct heat detector spacing as per NFPA 72, provide separate point for PIV, provide correct account address, may need two additional manual pull stations ( I will follow up)
|
INSP-Final Inspection | 8/3/2017 | 8/4/2017 | 8/4/2017 | P | CANC |
Troy Cobbley
|
|
|
Inspecting Technician: Ray McQueen Building access: building is open Building contact: Scott, ###-#### Phone #: ###-#### >> Inspection requested via web by Rose Peterson Inspection cancelled from web by: Rose Peterson
|