Permit Information
Permit NumberFIR17-00412
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 7009 W FRANKLIN RD
Project NameBKHS NORTH WING
Customer Number 
ePlanReviewYes
Description
[Bishop Kelly High School - North Wing Addition - Science and Technology]
The fire sprinkler scope of work consists of protecting a new wing of a school. Some of the area is protected as shell and core only. The shell and core area are designed for the future use in regards to pipe sizing and outlets. The system has above and below protection. Quick response sprinklers are used throughout. Extended coverage sprinklers and standard sprinklers are being utilized. The supply is in a one-hour riser room. The system is a 4”x4”x1½” grid with a 4” feed main, 4” riser and 6” C-900 underground.

[BLD17-00339]
Construct a new 24,845 square foot science and technology classroom building on the existing Bishop Kelly High School campus. The addition will new classroom areas and a gathering area. Each of the classrooms and the gathering area are provided with additional exit doors directly to the exterior. This building is fully fire sprinklered for area increase and is fully alarmed. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/12/20187/13/20187/13/2018PPASS
DetailsTroy Cobbley
permit finaled

. forward flush passed

Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection7/11/20187/12/20187/12/2018PFAIL
DetailsTroy Cobbley
Ceiling tile not installed yet. Interconnect with the fire alarm system was incorrect. Need forward flush test.
INSP-Sprinkler Rough-in6/26/20186/27/20186/27/2018PPASS
DetailsTroy Cobbley
Corrections made. Piping can be covered. Overhead hydro passed. FDC will need to be relocated/made accessible for fire dept personnel.

Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro6/27/20186/27/20186/27/2018PPASS
DetailsTroy Cobbley
Corrections made. Piping can be covered. Overhead hydro passed. FDC will need to be relocated/made accessible for fire dept personnel.

Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in6/25/20186/26/20186/26/2018APART
DetailsTroy Cobbley
Rough-in passed/piping can be covered. See the city approved plans for locations where several uprights need to be added and a large corridoe that the three pendant heads are overs paced

Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in5/11/20185/14/20185/14/2018PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping located above hardlids in the southwest restrooms and corridor complete, approved for cover.

Mike Martin is the contact for this rough to cover inspection. He is hoping for an appointment in the PM. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in2/14/20182/14/20182/14/2018PPART
DetailsTroy Cobbley
Rough-in for the overhead piping passed. Still missing acouple of earthquake braces that will be checked later. will need another cover inspection when the pendant drops have been installed. Per the contractor the architectural features in the main hallway will not have ceilings installed so it will allow the water from the upright sprinklers to provide protection.


Mike Martin is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in2/12/20182/12/20182/12/2018PPASS
DetailsTroy Cobbley
Underground hydro test passed. Undergrond flush passed. I performed a walk through for a rough-in but not quite ready yet.
INSP-Sprinkler Rough-in8/22/20178/22/20178/22/2017PPASS
DetailsTroy Cobbley
Underground rough to cover passed. Piping can be buried.