INSP-Final Inspection | 5/30/2018 | 6/4/2018 | 6/4/2018 | P | PASS |
Jim Page
|
|
|
Final inspection for underground supply complete.
Mike Bierman is the contact for this final inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Supply line flush | 1/17/2018 | 1/18/2018 | 1/18/2018 | A | PASS |
Troy Cobbley
|
|
|
Both underground supply line flushes passed
|
INSP-Sprinkler Rough-in/Hydro | 1/17/2018 | 1/18/2018 | 1/18/2018 | A | PASS |
Troy Cobbley
|
|
|
The underground hydro test for both underground supply lines passed
|
INSP-Sprinkler Rough-in | 10/10/2017 | 10/10/2017 | 10/10/2017 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for west underground supply complete, approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 9/5/2017 | 9/5/2017 | 9/5/2017 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for east underground supply complete, approved for cover.
|