INSP-Final Inspection | 5/1/2018 | 5/2/2018 | 5/2/2018 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 3/19/2018 | 3/19/2018 | 3/19/2018 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
INSP-Sprinkler Rough-in/Hydro | 3/16/2018 | 3/16/2018 | 3/16/2018 | P | FAIL |
Troy Cobbley
|
|
|
Overhead hydro failed. Loss of 5psi at the guage.
|
INSP-Supply line flush | 3/14/2018 | 3/15/2018 | 3/15/2018 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Supply line flush | 2/13/2018 | 2/14/2018 | 2/14/2018 | P | CANC |
Jim Page
|
|
|
Flush could not be completed, possible issue with valve or piping, request is cancelled.
|
INSP-Sprinkler Rough-in | 1/29/2018 | 1/29/2018 | 1/29/2018 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed and tenting passed. Piping is ok to cover.
|
INSP-Sprinkler Rough-in | 12/7/2017 | 12/8/2017 | 12/8/2017 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete, approved for cover.
|