INSP-Final Inspection | 5/9/2018 | 5/10/2018 | 5/10/2018 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
Give Mike a call before you head out. Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in/Hydro | 3/14/2018 | 3/14/2018 | 3/14/2018 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
INSP-Supply line flush | 3/9/2018 | 3/12/2018 | 3/12/2018 | A | PASS |
Scott Arellano
|
|
|
Flush wItnessed
|
INSP-Sprinkler Rough-in | 2/2/2018 | 2/5/2018 | 2/5/2018 | A | PASS |
Troy Cobbley
|
|
|
Tenting and overhead rough-in passed. Piping can be covered.
|
INSP-Sprinkler Rough-in | 12/14/2017 | 12/14/2017 | 12/14/2017 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete, approved for cover.
|