INSP-Final Inspection | 5/15/2018 | 5/17/2018 | 5/17/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
First thing in the morning if possible thanks. Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in/Hydro | 3/14/2018 | 3/14/2018 | 3/14/2018 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
INSP-Supply line flush | 3/9/2018 | 3/12/2018 | 3/12/2018 | A | PASS |
Scott Arellano
|
|
|
Flush wItnessed
|
INSP-Sprinkler Rough-in | 2/23/2018 | 2/23/2018 | 2/23/2018 | P | PASS |
Troy Cobbley
|
|
|
Piping rough-in and tenting passed. Piping can be covered.
|
INSP-Sprinkler Rough-in | 1/18/2018 | 1/19/2018 | 1/19/2018 | A | PASS |
Troy Cobbley
|
|
|
Underground supply line ok for cover .
Phone #: ###-#### Inspection requested via web by Sam Ball
|