INSP-Final Inspection | 5/9/2018 | 5/10/2018 | 5/10/2018 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
Give Mike a call before you head out. Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in/Hydro | 3/14/2018 | 3/14/2018 | 3/14/2018 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
INSP-Supply line flush | 3/9/2018 | 3/12/2018 | 3/12/2018 | A | DONE |
Scott Arellano
|
|
|
Inspection Passed. Discussed keeping hazmat in listed containment locker.
|
INSP-Sprinkler Rough-in | 2/13/2018 | 2/14/2018 | 2/14/2018 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping/tenting complete, approved for cover.
|
INSP-Sprinkler Rough-in | 12/14/2017 | 12/14/2017 | 12/14/2017 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete, approved for cover.
|
INSP-Sprinkler Rough-in | 12/8/2017 | 12/8/2017 | 12/8/2017 | P | CANC |
Jim Page
|
|
|
Underground not complete, inspection request will be rescheduled for a later date, this request is cancelled.
|