INSP-Final Inspection | 9/29/2017 | 10/2/2017 | 10/2/2017 | A | PASS |
Troy Cobbley
|
|
|
The remaining underground supply piping is ok to cover.
|
INSP-Sprinkler Rough-in | 9/28/2017 | 9/29/2017 | 9/29/2017 | P | CANC |
Troy Cobbley
|
|
|
Contact Leroy Anderson ###-#### 30 min prior to inspection start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in | 8/24/2017 | 8/25/2017 | 8/25/2017 | A | PASS |
Troy Cobbley
|
|
|
The In Building Riser (5'-0") stub out is ok to cover. I spoke to the fitter and the job site superintendant about my concerns for proper bury depth of the remaining piping when installed.
|
INSP-Sprinkler Rough-in | 8/24/2017 | 8/24/2017 | 8/24/2017 | P | CANC |
Troy Cobbley
|
|
|
Contact Logan Bice ###-#### 30 Min prior to UG RTC start please.
Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|