INSP-Final Inspection | 4/24/2018 | 4/25/2018 | 4/25/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in/Hydro | 3/9/2018 | 3/9/2018 | 3/9/2018 | P | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Supply line flush | 2/13/2018 | 2/14/2018 | 2/13/2018 | P | CANC |
Troy Cobbley
|
|
|
1 pm if that works for you Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|