Permit Information
Permit NumberFIR17-00501
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 2300 S APPLE ST
Project Name#0169 Boise Albertsons Fuel
Customer NumberUDG ONLY
ePlanReviewYes
Description
[Albertsons Fuel Express #0169 - UDG Only] - Quick Permit
DEMO EXISTING BUILDING NEW 3027sqft CONVENIENCE STORE. THIS IS FOR THE FIRE SPRINKLER UNDERGROUND SUPPLY ONLY 4"x90'± C-900 WITH ASSOCIATED THRUST BLOCKS.. THE FDC WILL BE MOUNTED ON THE WALL.

[BLD17-01581]
Demo existing building (BLD17-02245), and construct a new 3,027 sf Convenience store and 4,365 sf noncombustible fuel canopy with (6) fuel dispensers, (2) underground fuel storage tanks and associated paving, planters and curbs per the approved plans. A separate Fire Department Operational permit is required; as regulated by Boise Fire Department. (Contact 570-6500) . This building is not fire sprinklered. Special inspections are required per the attached form 310. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/14/201712/14/201712/14/2017PPASS
DetailsJim Page
Final inspection for underground supply complete.
INSP-Final Inspection12/11/201712/12/201712/12/2017APART
DetailsJim Page
Partial final inspection complete for overhead fire sprinklers, fire alarms/monitoring is still being worked on, when fire alarms are completed then fire sprinkler permit can be finaled.
INSP-Sprinkler Rough-in/Hydro12/11/201712/12/201712/11/2017ADONE
DetailsJim Page
Overhead hydrostatic test witnessed, no pressure loss observed at gauge.
INSP-Supply line flush11/28/201711/29/201711/29/2017ADONE
DetailsJim Page
Underground flush complete
INSP-Supply line flush11/27/201711/28/201711/28/2017PCANC
DetailsJim Page
Flush rescheduled for 29NOV2017, this request is cancelled.
INSP-Sprinkler Rough-in/Hydro11/27/201711/28/201711/28/2017PCANC
DetailsJim Page
Hydrostatic test cancelled per conversation with point of contact, Jim Baker Phone #: ###-#### , hydrostatic test will be rescheduled for a later date.
INSP-Sprinkler Rough-in10/18/201710/19/201710/19/2017APASS
DetailsJim Page
Rough to cover inspection for remaining underground supply complete, approved for cover.
INSP-Sprinkler Rough-in8/31/20178/31/20178/31/2017PPART
DetailsJim Page
Rough to cover inspection for in building riser and stub out from the footing complete, area inspected approved for cover. Remaining underground to be installed at a later date.