Permit Information
Permit NumberFIR17-00516
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 101 S CAPITOL BLVD Unit: 10TH FLR
Project NameUS Ecology TI at US Bank 10th
Customer Number 
ePlanReviewYes
Description
[US Ecology TI at US Bank 10th Floor] - Quick Pemit
Relocate and replace with new, and add a total of 25 new pendent sprinklers to accommodate the new wall and ceiling layout.

[BLD17-02186]
This building is fire sprinklered because it is a high-rise. Permit to remodel an existing 14,600 sq. ft. 10th floor of an existing high-rise building. This permit is approved contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls within the tenant space floor area, removal of select door/door frames, removal of select millwork, removal of select plumbing fixtures, construction of select interior non-bearing walls to create (26) offices, (3) conference rooms, a break room, a mail room, a storage room, an IT room, an open office area, a waiting room and an accessible shower, relocating existing light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with chapter 8 of the 2012 IBC. This building is fully fire sprinklered any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/6/201711/6/201711/6/2017PPASS
DetailsJim Page
Final fire sprinkler inspection for area of work passed/complete.
INSP-Sprinkler Rough-in11/6/201711/6/201711/6/2017PPASS
DetailsJim Page
Rough to cover inspection for area of work complete, area of work approved for cover.
INSP-Final Inspection11/2/201711/3/201711/3/2017AFAIL
DetailsTroy Cobbley
Called contact and left message on voice mail. Went to job and did not make contact. I noted that final inspections are scheduled but no rough-in inspection has been performed. Ceilings will need to be removed for verification of hangers and piping.

Mike Martin is requesting a final inspection for the 10th floor of US Bank. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus