Permit NumberFIR17-00522
StatusFinaled
Name STATEFIRE DC SPECIALTIES
Site Address 3625 W ELDER ST
Project NameComfort Inn Suites
Customer Number 
ePlanReviewYes
Description
[Comfort Inn Suites]
The fire sprinkler scope of work consists of protecting a four level motel with and attic. The piping is predominately CPVC with residential sprinklers. There are Light and Ordinary Hazard areas on the first level. The attic and porte cochere are protected with dry system. There are two wet standpipes. One of the standpipes has floor control valve assemblies.

• The underground piping is under permit FIR17-00198

[BLD17-00022]
For the construction of a new 108 room 4 story wood framed hotel with work to include general site work and utilities. The first story is 15,970 sq. ft. consists of 12 sleeping rooms, a pool, general off, laundry room, lobby and a breakfast area and the 900 sq. ft. porte cochere, the remaining 3 stories are 15,114 sq. ft. each with 32 sleeping units on the 2nd and 3rd stories and 33 units on the 4th story. This building is fully fire sprinklered with an NFPA 13 system for area increase

Alternative Materials and Methods:

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/25/20186/26/20186/26/2018APASS
DetailsTroy Cobbley
Permit finaled

Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Final Inspection6/14/20186/15/20186/15/2018AFAIL
DetailsTroy Cobbley
The interconnect with the fire alarm system passed. Permit can be finaled when the Smoking Canopy is done.


Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Final Inspection6/13/20186/14/20186/14/2018AFAIL
DetailsTroy Cobbley
Waiting on the project related fire alarm permit so that the interconnections can be tested. Forward flush passed. Need to inspect the Smokers Canopy.

Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Final Inspection6/12/20186/13/20186/13/2018ACANC
DetailsTroy Cobbley
Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in/Hydro6/11/20186/12/20186/12/2018APASS
DetailsTroy Cobbley
24 hour air test on the dry system passed.

Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in/Hydro6/7/20186/7/20186/7/2018PPART
DetailsTroy Cobbley
The 200lb hydro test for the dry system and the wet stand pipe passed. The hydro tests for the 2nd, 3rd and 4th floors failed due to visible pressure loss on the guages.


Wet and Dry hydro Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in/Hydro6/5/20186/6/20186/6/2018ACANC
DetailsTroy Cobbley
Scheduled for the wrong day.

2hr and a 24hr Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in6/4/20186/5/20186/5/2018APASS
DetailsTroy Cobbley
The remaining first floor piping is ok for cover. The previous corrections noted have been corrected.

hallways and rooms with grid Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in5/31/20186/1/20186/1/2018APART
DetailsTroy Cobbley
first floor hallway and rooms with grid are ok for cover. I noted that a pendant will need to be added in a closet as discussed and two heads are overspaced in the corridor. I will check these at the next inspection.
INSP-Sprinkler Rough-in5/14/20185/15/20185/15/2018PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping above ceiling grid in corridors on levels 2, 3 and 4 complete, approved for cover.

rough to cover hallways on 4th,3rd, and 2nd Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in5/10/20185/11/20185/11/2018PPASS
DetailsTroy Cobbley
See the city approved plans for location marked "ok" where piping is approved for cover. Todays area was the Laundry room.


partial rough in on first floor. Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in5/4/20185/7/20185/7/2018PPASS
DetailsTroy Cobbley
dining area and high part of lobby is ok for cover. See the city approved plans for notations with todays date.
INSP-Conference4/27/20184/30/20184/30/2018PDONE
DetailsTroy Cobbley
I met with Randy on the exterior canopy on the southeast corner of the building. There are issues getting the required sprinkler coverage under the canopy. I deferred him to my supervisors. Tim has already addressed the subject with the sprinkler designer.

Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in4/30/20184/30/20184/30/2018PPART
DetailsTroy Cobbley
the first floor soffit in the lobby is ok to cover. See the city approved plans for specific location
INSP-Sprinkler Rough-in4/10/20184/13/20184/13/2018APART
DetailsJim Page
Rough to cover inspection for level 1 fire sprinkler piping above sheetrock including dry system for drive through canopy complete, areas where ceiling grid will be installed will need a RTC inspection before covered, overehad fire sprinkler piping located above hardlids on level 1 inluding drive trhough canopy approved for cover.
INSP-Sprinkler Rough-in4/10/20184/12/20184/10/2018ACANC
DetailsTroy Cobbley
First floor Phone #: ###-#### >> Inspection requested via web by Matthew Lewis Inspection cancelled from web by: Matthew Lewis
INSP-Sprinkler Rough-in2/21/20182/22/20182/22/2018APASS
DetailsTroy Cobbley
2nd, 3rd and 4th floor main piping, hangers and earthquake bracing inspected and approved. A separate cover inspection will be needed once the drops are cut.

Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in2/16/20182/20/20182/20/2018AFAIL
DetailsTroy Cobbley
There were no city approved plans on site to verify the earthquake bracing. I noted that the earthquake attachments for the cpvc piping are not shown on the plans.


hallways on 4th,3rd and 2nd Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in1/22/20181/22/20181/22/2018PPASS
DetailsScott Arellano
Tenting inspection approved in all rooms and west corridor.
INSP-Sprinkler Rough-in1/19/20181/19/20181/19/2018PFAIL
DetailsTroy Cobbley
Todays inspection was for the fourth floor east of grid line 10. Piping in the rooms can not be covered due to tenting that needs repaired.
INSP-Sprinkler Rough-in1/18/20181/18/20181/18/2018PPART
DetailsTroy Cobbley
The rough-in and tenting has passed for the fourth floor piping guest rooms from column line 10 to the west end of the building. This piping can be covered.
INSP-Sprinkler Rough-in1/15/20181/16/20181/16/2018AFAIL
DetailsTroy Cobbley
Inspection was for the 4th floor wet and dry system. For cover approval of the wet system I need tenting done and all drops sidewalls installed (need approval for exposed cpvc piping in chases). For cover approval of the dry system I need resubmittals due to additional fittings and pipe routing, need data sheet for the Concealed Space Heads because they may be mounted too low, need the longitudinal bracing installed as discussed.


Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in12/26/201712/26/201712/26/2017PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping/pendant heads located on levels 2 and 3 excluding the corridors complete, approved for cover.
INSP-Sprinkler Rough-in11/7/201711/8/201711/8/2017APASS
DetailsTroy Cobbley
Partial first floor rooms rough-in passed. See the city approved plans for branchlines marked "ok" at the ends that have been inspected. These lines can be covered. The mains down the corridor has not been installed

Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Supply line flush11/7/201711/8/201711/8/2017ACANC
DetailsTroy Cobbley
Wrong permit number scheduled
INSP-Supply line flush11/7/201711/7/201711/7/2017PCANC
DetailsTroy Cobbley
Phone #: ###-#### >> Inspection requested via web by Matthew Lewis Inspection cancelled from web by: Matthew Lewis