INSP-Final Inspection | 11/3/2017 | 11/6/2017 | 11/6/2017 | A | PASS |
Jim Page
|
|
|
Final inspection for area of work demo complete. Noted that the building did not have heat when inspection for demo work was performed, the building needs to be maintained at a minimum of 40 degrees per fire sprinkler code, heat needs to be maintained to protect the wet type fire sprinkler system from freezing.
|