INSP-Final Inspection | 11/12/2019 | 11/13/2019 | 11/13/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Todd Ketterling is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 11/1/2019 | 11/4/2019 | 11/4/2019 | P | CANC |
Troy Cobbley
|
|
|
Todd Ketterling is the contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 5/23/2019 | 5/24/2019 | 5/24/2019 | A | PASS |
Troy Cobbley
|
|
|
The Training Room and Closet are approved for cover.
Todd Ketterling is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 4/23/2019 | 4/24/2019 | 4/24/2019 | A | PASS |
Troy Cobbley
|
|
|
The overhead 200lb hydro for the east bay dry system witnessed with no pressure loss at the guage.
Todd Ketterling is the contact. This inspection is for an overhead hydro only. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 4/22/2019 | 4/23/2019 | 4/23/2019 | A | PART |
Troy Cobbley
|
|
|
Sprinkler work is complete for the five pendant heads in the north corridor.
Todd Ketterling is the contact. Thank you for the hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 4/18/2019 | 4/19/2019 | 4/19/2019 | P | PART |
Jim Page
|
|
|
Partial rough to cover ispection for overhead fire sprinkler piping complete, notated the city approved drawings with yellow highlighter areas approved to cover.
Todd Ketterling is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 2/11/2019 | 2/12/2019 | 2/12/2019 | P | PART |
Troy Cobbley
|
|
|
Phase three sprinkler work is complete.
Todd Ketterling is the contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 1/31/2019 | 2/1/2019 | 2/1/2019 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for location marked "ok" where sprinkler piping is ok for cover.
Todd Ketterling is your contact. Thanks for the hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 12/19/2018 | 12/20/2018 | 12/20/2018 | A | PASS |
Troy Cobbley
|
|
|
The piping above the two south side restrooms is ok for cover.
|
INSP-Final Inspection | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | PART |
Troy Cobbley
|
|
|
Phase 2 work is complete
Todd Ketterling is the contact for this final inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 10/24/2018 | 10/25/2018 | 10/25/2018 | P | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 10/19/2018 | 10/24/2018 | 10/24/2018 | P | CANC |
Troy Cobbley
|
|
|
Todd Ketterling is the contact for this final inspection. Thank you for your help. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Final Inspection | 10/24/2018 | 10/26/2018 | 10/24/2018 | A | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Final Inspection | 10/24/2018 | 10/25/2018 | 10/24/2018 | A | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Final Inspection | 10/19/2018 | 10/22/2018 | 10/22/2018 | A | PASS |
Troy Cobbley
|
|
|
Forward flush passed
|
INSP-Final Inspection | 10/18/2018 | 10/19/2018 | 10/19/2018 | A | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 10/17/2018 | 10/18/2018 | 10/18/2018 | A | FAIL |
Troy Cobbley
|
|
|
The interconnection with the fire alarm panel has not been pre-tested, the FDC is not in the location shown as approved on the plans, need to perform a forward flush test now since people will be utilizing the new area that the new fire sprinkler system protects.
Todd Ketterling is the contact for this final inspection. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 10/10/2018 | 10/11/2018 | 10/11/2018 | A | PASS |
Troy Cobbley
|
|
|
24 hour air test passed.
|
INSP-Sprinkler Rough-in | 10/9/2018 | 10/10/2018 | 10/10/2018 | P | PART |
Troy Cobbley
|
|
|
24 hour air test started at 11:00am with 41psi on the guage.
|
INSP-Sprinkler Rough-in/Hydro | 9/4/2018 | 9/5/2018 | 9/5/2018 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations mrked "ok" ehere piping is approved for cover. I noted a missing branchline restraint that will be checked at the next inspection. Also the dry sidewall has not been installed yet under the main exit canopy. The overhead hydro's passed with no visible loss at the guage.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 7/26/2018 | 7/27/2018 | 7/27/2018 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations marked "ok" in red where the piping is ok for cover.
Phone #: ###-#### Inspection requested via web by Stan Beus
|