INSP-Final Inspection | 4/22/2019 | 4/25/2019 | 4/25/2019 | A | PASS |
Jim Page
|
|
|
Final inspection for scope of work under this permit complete.
Steve Johnson (cell: ###-####) will meet you in the lobby of B26 Phone #: ###-#### Inspection requested via web by Steve Johnson
|
INSP-Final Inspection | 9/11/2018 | 9/11/2018 | 9/12/2018 | P | FAIL |
Jim Page
|
|
|
Chris will take you to B.51 Phone #: ###-#### >> Inspection requested via web by John Wheeler
___________
The drawing did not correlate with the installation. Revised drawings are required.
|