INSP-Final Inspection | 3/2/2018 | 3/2/2018 | 3/2/2018 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
|
INSP-Final Inspection | 12/5/2017 | 12/6/2017 | 12/6/2017 | A | PART |
Jim Page
|
|
|
Partial final inspection complete for fire sprinklers in area of work passed/complete. Northwest corridor (part of core and shell) has dry type fire sprinkler heads that are supplied from the coffee shop side, dry heads to be installed before coffee shop completion. Dry sprinkler head piping install will be verified at life fire safety inspection.
|
INSP-Sprinkler Rough-in/Hydro | 11/15/2017 | 11/15/2017 | 11/15/2017 | A | PASS |
Jim Page
|
|
|
Hydrostatic test for new fire sprinkler piping installed in tenant space complete. Rough to cover inspection for overhead fire sprinkler piping located above hardlids complete, area of work approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 11/9/2017 | 11/13/2017 | 11/13/2017 | A | CANC |
Jim Page
|
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|