INSP-Final Inspection | 12/6/2017 | 12/7/2017 | 12/7/2017 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 12/5/2017 | 12/6/2017 | 12/6/2017 | A | CANC |
Troy Cobbley
|
|
|
Not ready for final yet due to needing to re-wire the hvac unit shutdown.
Randy Phone #: ###-#### Paula ###-####
|
INSP-Final Inspection | 12/1/2017 | 12/4/2017 | 12/4/2017 | A | FAIL |
Troy Cobbley
|
|
|
All items tested except for the three duct smoke detectors. Two of the three duct smoke detectors have not been installed correctly.
Randy backup number ###-#### Puala Phone #: ###-####
|
INSP-Final Inspection | 12/1/2017 | 12/1/2017 | 12/1/2017 | P | CANC |
Troy Cobbley
|
|
|
Chris or ###-#### Paula Phone #: ###-####
|
INSP-Final Inspection | 11/30/2017 | 11/30/2017 | 11/30/2017 | P | FAIL |
Troy Cobbley
|
|
|
Not ready for final yet. No testing performed. Contractor to contact the plan reviewer about wether plan modifications are needed or as-builts due to the additional devices, deleted devices, changed devices. Floor plan does not match. No small documents were on site and the approved plans are so small I can hardly read them.
Paula-would like as late as possible Phone #: ###-####
|