Permit NumberFIR17-00679
StatusFinaled
Name ALL VALLEY FIRE
Site Address 3485 N COLE RD
Project NameCSL Plasma
Customer Number 
ePlanReviewYes
Description
[CSL Plasma]
The fire sprinkler scope of work consists of relocating the riser from the middle of the store to a riser room in the back wall. A new extension of 6”X20’ ± C-900 piping will be added to the existing underground and brought into the building. New 6” main will be ran from the new riser to the existing connection.

Alternative Materials and Methods:
This project includes approved code alternates to the following fire protection systems and/or building life safety systems. Please review the supplemental documents attached to this building permit case for details. Fire protection “shop drawings” shall include approved code alternate design.

• There are no AMM at this time.

There does not seem to be an associated building permit at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/15/201712/15/201712/15/2017APASS
DetailsJim Page
Final inspection complete, see attached document.
INSP-Sprinkler Rough-in/Hydro12/7/201712/7/201712/7/2017PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in scope of work complete, overhead fire sprinkler piping approved for cover. Underground flush was completed during this inspection request. Underground hydrostatic test could not be completed due to leakage going past the water purveyor supplied valve. Installing contractor will need to inform water purveyor about issue of water passing by when underground valve is shut.
INSP-Sprinkler Rough-in12/6/201712/7/201712/7/2017APASS
DetailsTroy Cobbley
The remaining underground supply piping is ok for cover.

Jeremy-to cover Phone #: ###-####
INSP-Sprinkler Rough-in12/6/201712/6/201712/6/2017PCANC
DetailsTroy Cobbley
Concrete not on site yet. Will need to be rescheduled.

Underground - Cole Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro12/6/201712/6/201712/6/2017PPASS
DetailsTroy Cobbley
Overhead hydro of the new piping passed.

COle Phone #: ###-####
INSP-Sprinkler Rough-in11/29/201711/30/201711/29/2017APART
DetailsJim Page
Underground supply inspected for cover from the in building riser to the spot for tie-in, area inspected approved for cover. Remaining pipe for the tie-in will be scheduled for a later date.