INSP-Final Inspection | 12/15/2017 | 12/15/2017 | 12/15/2017 | A | PASS |
Jim Page
|
|
|
Final inspection complete, see attached document.
|
INSP-Sprinkler Rough-in/Hydro | 12/7/2017 | 12/7/2017 | 12/7/2017 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in scope of work complete, overhead fire sprinkler piping approved for cover. Underground flush was completed during this inspection request. Underground hydrostatic test could not be completed due to leakage going past the water purveyor supplied valve. Installing contractor will need to inform water purveyor about issue of water passing by when underground valve is shut.
|
INSP-Sprinkler Rough-in | 12/6/2017 | 12/7/2017 | 12/7/2017 | A | PASS |
Troy Cobbley
|
|
|
The remaining underground supply piping is ok for cover.
Jeremy-to cover Phone #: ###-####
|
INSP-Sprinkler Rough-in | 12/6/2017 | 12/6/2017 | 12/6/2017 | P | CANC |
Troy Cobbley
|
|
|
Concrete not on site yet. Will need to be rescheduled.
Underground - Cole Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 12/6/2017 | 12/6/2017 | 12/6/2017 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro of the new piping passed.
COle Phone #: ###-####
|
INSP-Sprinkler Rough-in | 11/29/2017 | 11/30/2017 | 11/29/2017 | A | PART |
Jim Page
|
|
|
Underground supply inspected for cover from the in building riser to the spot for tie-in, area inspected approved for cover. Remaining pipe for the tie-in will be scheduled for a later date.
|