INSP-Final Inspection | 8/12/2019 | 8/13/2019 | 8/13/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for scope of work has been completed. Piping and ductwork obstructions have been added that were not part of the original scope of work, obstructions will need coverage before life fire safety inspection, a seperate permit will be required for obstruction coverage.
Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Sprinkler Rough-in | 8/13/2019 | 8/13/2019 | 8/13/2019 | A | PASS |
Jim Page
|
|
|
Rough in inspection for this system has been completed.
|
INSP-Sprinkler Rough-in/Hydro | 8/13/2019 | 8/13/2019 | 8/13/2019 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for this system has been witnessed, no pressure loss was observed.
|