INSP-Final Inspection | 2/6/2018 | 2/7/2018 | 2/7/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Contact is Sean. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Final Inspection | 2/6/2018 | 2/6/2018 | 2/6/2018 | P | FAIL |
Troy Cobbley
|
|
|
Need correct suite number, all of the wall mounted strobes are too low, the 15cd ceiling mounted strobes can't be over 10' and the 95cd strobe in the Lobby is overspaced. No actual testing of devices happened. As-builts will need to be submitted to the plan reviewer prior to a final sign off.
Contact is Sean Phone #: ###-#### Inspection requested via web by Morgan Ahten
|