INSP-Final Inspection | 4/23/2019 | 4/24/2019 | 4/24/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
We would like to perform this in conjunction with fire alarm testing. Please call Lonnie with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in | 7/24/2018 | 7/24/2018 | 7/24/2018 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping complete for buidling B levels 1, 2 and 3. General contractor needs to provide documentation for foam sheet insulation rating of installed an the deck, a minimum of R-38 is required for freeze protection on level 3, cover is approved at general contractors risk, if sheeting is not R-38 rated then any cover material over fire sprinkler piping will need to be removed and a R-38 or higher rating will need to be installed. Cover is approved for building A for overhead fire sprinkler piping.
|
INSP-Sprinkler Rough-in/Hydro | 7/23/2018 | 7/24/2018 | 7/24/2018 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauges.
RANDY IS OUR FOREMAN Phone #: ###-#### Inspection requested via web by Brad Bettencourt
|
INSP-Sprinkler Rough-in | 6/27/2018 | 6/27/2018 | 6/27/2018 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping complete for buidling A levels 1, 2 and 3. General contractor needs to provide documentation for foam sheet insulation rating of installed an the deck, a minimum of R-38 is required for freeze protection on level 3, cover is approved at general contractors risk, if sheeting is not R-38 rated then any cover material over fire sprinkler piping will need to be removed and a R-38 or higher rating will need to be installed. Cover is approved for building A for overhead fire sprinkler piping.
|
INSP-Sprinkler Rough-in/Hydro | 6/26/2018 | 6/27/2018 | 6/27/2018 | A | DONE |
Jim Page
|
|
|
Hydrostatic test witnessed for overhhead fire sprinkler piping for levels 1, 2 and 3 Building A, no pressure loss observed at riser provided gauges.
RANDY CARTRIGHT IS OUR FOREMAN Phone #: ###-#### Inspection requested via web by Brad Bettencourt
|
INSP-Supply line flush | 6/22/2018 | 6/22/2018 | 6/22/2018 | P | DONE |
Jim Page
|
|
|
Undergorund main line flush complete for both buildings.
Phone #: ###-#### Inspection requested via web by Christophe Wilson
|
INSP-Sprinkler Rough-in/Hydro | 6/22/2018 | 6/22/2018 | 6/22/2018 | A | DONE |
Jim Page
|
|
|
Hydrostatic test witnessed for both underground main supplies, no pressure loss observed at conractor provided gauges.
|
INSP-Sprinkler Rough-in | 4/16/2018 | 4/17/2018 | 4/17/2018 | P | CANC |
Jim Page
|
|
|
MIKE OSWALD IS OUR FOREMAN Phone #: ###-#### >> Inspection requested via web by Brad Bettencourt Inspection cancelled from web by: Brad Bettencourt
|