Permit Information
Permit NumberFIR18-00051
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 6675 S EISENMAN RD
Project NameGowen Industrial Park Bldg. B
Customer Number 
ePlanReviewYes
Description
[Gowen Industrial Park Building B]
The fire sprinkler scope of work consists of providing protecting for a spec warehouse with ESFR sprinklers. The system is supplied by a 1500 Gpm @ 115 Psi fire pump with a pressure reducing valve. The system layout is a 6”x4”x2” grid.

• The underground piping is under permit FIR17-00643.

Location on Plan - Warehouse
Commodity - Exposed Unexpanded Plastics
Classification - Group A Plastic
Storage Type (rack, solid pile, etc.) - Rack o Solid Pile
Pallet Type (wood or plastic) - Wood
Aisle Width - 8’
Height of Storage - 20’
Ceiling Height - 35’
Encapsulated - No
Solid Shelves - No
Smoke and Heat Vents - No
Draft Curtain - No
In Rack Sprinklers - No
Sprinkler Type - ESFR K=19.6
High Temperature Sprinklers Required - ESFR
Applicable NFPA Section - T 15.4.1
Hydraulic Design Criterion - (4) Sprk for (3) Lines @ 52 Psi
Hose Stream Requirements - 250 Gpm

Plan Mod #1 – 2/05/2018
o Some piping had to be relocated due to structural steel changes.
o Riser room flange was relocated
[BLD17-02765]
The fire sprinkler system is used for building area increase and for fire area. To construct a 41,146 square foot building to be used for office, storage, and perhaps fabrication. A total of four (4) tenant spaces separated by potentially 1-hr interior walls with block-out framing for potential future openings will be created. This permit is not intended to establish a Certificate of Occupancy for any tenant or for any portion of this building. Each tenant is required to apply for their own Certificate of Occupancy. Separate permits for racking over 8 feet tall are also required. Work is to include reinforced concrete footings, reinforced concrete tilt-up panels, reinforced concrete slab on grade, recessed concrete floors with dock levelers at some overhead doors, cantilevered canopies, steel columns, open web steel roof girders, open web steel roof joists, steel roof deck, continuous insulation installed on top of the roof deck, a membrane roof covering, skylights, metal screens for roof top mechanical units, roll-up exterior doors, side-hinged swinging exterior doors, steel exterior landings and stairways at the West exit doors, storefront windows, trash enclosures, unoccupied mezzanine above the office area supported by bearing walls, interior nonbearing walls, four toilet rooms accessible to the disabled, and finishes. Special Inspection is required for soil (excavation and compacted fill), concrete footings (including reinforcing steel), concrete tilt-up panels (including reinforcing steel), anchors post-installed in hardened concrete, and steel (including welding). The work is required to comply with the approved drawings, with the Geotechnical Engineer’s recommendations, with the Structural Calculations, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any installation work on such systems. **CJW**

Alternative Materials and Methods:

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/13/20186/14/20186/14/2018APASS
DetailsJim Page
Final fire sprinkler inspection complete.

Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection6/12/20186/12/20186/12/2018PCANC
DetailsJim Page
Fire alarms are not ready, fire alarm associated devices could no be tested, this inspection request is cancelled.

Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in6/1/20186/6/20186/6/2018PDONE
DetailsJim Page
Fire pump commissioning complete.

The fire pump supplier will be ready for start up inspection at about 1:00 for buildings B and C. Mike Martin will be the contact. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro5/9/20185/10/20185/10/2018ADONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping complete, no pressure loss observed.

Mike Martin is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro5/4/20185/7/20185/7/2018ACANC
DetailsJim Page
Hydrostatic test cancelled per point of contact, hydro will be rescheduled for a later date.

Jon Beazer is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro5/2/20185/3/20185/3/2018ACANC
DetailsJim Page
Hydrostatic test cancelled per conversation with point of contact, hydro will be rescheduled for a later date.

Jon Beazer is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in4/6/20184/9/20184/9/2018PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping located above various hardlids, notated city approved drawings with red ink areas approved for cover.
INSP-Sprinkler Rough-in3/9/20183/9/20183/9/2018PPASS
DetailsJim Page
Rough to cover inspection for undergorund supply complete, approved for cover.