INSP-Final Inspection | 2/1/2018 | 2/2/2018 | 2/2/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 1/30/2018 | 1/31/2018 | 2/1/2018 | P | FAIL |
Troy Cobbley
|
|
|
No approved plans or small documents on site. I did a courtesy walk through with a set of non-approved shop drawings and noted many corrections needed such as over spaced strobes added strobed, strobe too high ceiling device mounted on wall, wall mounts on the plans changed to ceiling mounts, corridor missing coverage....ect. No inspection performed.
|