INSP-Sprinkler Rough-in | 5/29/2018 | 5/29/2018 | 5/29/2018 | P | PASS |
Troy Cobbley
|
|
|
Rough-in for the drops passed. Piping can be covered. Protection has been provided under overhead door.
Call Anthony to coordinate Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 5/23/2018 | 5/23/2018 | 5/23/2018 | P | PASS |
Troy Cobbley
|
|
|
Todays inspection was just for the drops from the existing branchlines. They all looked good. I noted that sprinkler coverage is missing under the overhead door and once the ceiling was installed under the door a combustible concealed space would be created that will require sprinkler protection.
Call Anthony to coordinate, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|