INSP-Final Inspection | 5/24/2019 | 5/24/2019 | 5/24/2019 | P | PASS |
Jim Page
|
|
|
Final inspection for underground supply complete.
|
INSP-Supply line flush | 8/14/2018 | 8/16/2018 | 8/16/2018 | A | DONE |
Jim Page
|
|
|
Underground main line flush complete.
THIS IS A UNDERGROUND FLUSH AT 10:00 AM WITH SUEZ WATER JUSTIN IS OUR CONTACT Phone #: ###-#### Inspection requested via web by Brad Bettencourt
|
INSP-Sprinkler Rough-in/Hydro | 8/14/2018 | 8/15/2018 | 8/15/2018 | A | DONE |
Jim Page
|
|
|
Underground hydrostatic test witnessed, no pressure loss observed at contractor provided gauge.
THIS IS A UNDERGROUND HYDRO JUSTIN IS OUR CONTACT Phone #: ###-#### Inspection requested via web by Brad Bettencourt
|
INSP-Sprinkler Rough-in | 2/28/2018 | 2/28/2018 | 2/28/2018 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply/piping complete, approved for cover.
|