Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR18-00125
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 2505 S FEDERAL WAY
Project NameDykman Vanilla 2nd floor
Customer Number 
ePlanReviewYes
Description
[Dykman Vanilla 2nd Floor]
The fire sprinkler scope of work consists of protecting below a new mezzanine. Install 86 SSU and new OH2 wet system w/ floor control. In addition, add & relocate 7 SSU for new elevator/stair walls at the existing roof system.

[BLD16-03095]
Plan modification to alter stair width, change the 1st floor lobby layout, added a door at 1st floor lobby, relocate the elevator, relocate the elevator roof penthouse and remove opening on the second floor to add approx. 108 sq. ft. to the second floor. 2-15-2018 JG// NO OCCUPANCY ALLOWED UNDER THIS PERMIT. TENANT SHALL APPLY FOR CERTIFICATE OF OCCUPANCY PRIOR TO OCCUPYING THE SPACE. Permit is to remodel an existing 14,153 sq. ft. building by adding 8,310 sq. ft. second floor. Approval is contingent upon adhering to the approved plans on file. Work to include: new 5’ wide concrete walkway from rear exterior exit landing to the existing sidewalk, new engineered upper second floor decking, construction of select interior nonbearing walls to create a lobby area, an elevator shaft and stairway walls, new interior elevator, new interior exit stairway, new exterior exit stairway, new exterior door opening, new elevator, new light fixtures, electrical work and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Note: Minimum number of required plumbing fixture and area of refuge to be addressed when future new tenant occupies the second floor, see attached document in Tidemark. JG

Alternative Materials and Methods:

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/20/20189/24/20189/24/2018APASS
DetailsTroy Cobbley
Permit finaled

Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in5/18/20185/18/20185/18/2018APART
DetailsJim Page
Rough in inspection for overhead fire sprinkler piping partially complete, heads for elevator shaft to be installed at a later date, remaining pipin approved for cover.

. Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in/Hydro5/17/20185/18/20185/18/2018ADONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauge.

. Phone #: ###-#### Inspection requested via web by Sam Ball