INSP-Final Inspection | 7/26/2019 | 7/29/2019 | 7/29/2019 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
Nate Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Final Inspection | 7/26/2019 | 7/26/2019 | 7/26/2019 | P | CANC |
Troy Cobbley
|
|
|
Nate Phone #: ###-#### >> Inspection requested via web by Nathan Stenquist Inspection cancelled from web by: Nathan Stenquist
|
INSP-Final Inspection | 7/22/2019 | 7/26/2019 | 7/26/2019 | A | FAIL |
Troy Cobbley
|
|
|
Building is locked. No inspection performed
Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Sprinkler Rough-in | 3/5/2019 | 3/6/2019 | 3/6/2019 | A | PASS |
Troy Cobbley
|
|
|
Rough in passed. Fire alarm tie in passed. Apoproved for cover. Final can be signed off after ceiling tile is installed.
mike Phone #: ###-####
|
INSP-Sprinkler Rough-in | 3/4/2019 | 3/5/2019 | 3/5/2019 | P | CANC |
Troy Cobbley
|
|
|
Mike Phone #: ###-####
|
INSP-Final Inspection | 2/19/2019 | 2/20/2019 | 2/20/2019 | P | CANC |
Troy Cobbley
|
|
|
Not ready for a final yet. Missing ceiling tile and the project related fire alarm was not ready. Mike Phone #: ###-####
|
INSP-Sprinkler Rough-in | 8/27/2018 | 8/27/2018 | 8/27/2018 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping complete, approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 8/27/2018 | 8/27/2018 | 8/27/2018 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss at riser provided gauge.
Mike Phone #: ###-####
|
INSP-Supply line flush | 7/16/2018 | 7/17/2018 | 7/17/2018 | A | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed
Troy Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 7/13/2018 | 7/13/2018 | 7/13/2018 | P | PASS |
Troy Cobbley
|
|
|
underground hydro test passed
- Troy Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 7/12/2018 | 7/12/2018 | 7/12/2018 | P | FAIL |
Troy Cobbley
|
|
|
Underground hydro test failed due to visible loss on the guage.
Troy Phone #: ###-####
|
INSP-Sprinkler Rough-in | 5/3/2018 | 5/4/2018 | 5/4/2018 | A | PASS |
Troy Cobbley
|
|
|
The remaining underground piping is ok for cover.
|
INSP-Sprinkler Rough-in | 4/20/2018 | 4/20/2018 | 4/20/2018 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for change of direction, PIV and piping between change of direction and PIV complete, approved for cover. Piping after PIV to be installed at a later date.
|
INSP-Sprinkler Rough-in | 4/19/2018 | 4/19/2018 | 4/19/2018 | P | PART |
Jim Page
|
|
|
Partial rough to cover inspection complete for underground supply, approximately 100 feet of west to east section approved for cover. Change of direction to the north, the PIV and stub in to be scheduled for a later date.
|