Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR18-00146
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 9485 W FAIRVIEW
Project NameDennis Dillon Maserati
Customer Number 
ePlanReviewYes
Description
[Dennis Dillon - Maserat/Alfa Romeo
Remodel of the show room. Some of the walls and ceilings to be removed and new walls and ceilings installed. Add and relocate sprinklers as needed

[BLD17-02777]
Permit is to remodel an existing 14,044 sq. ft. automotive dealership building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, removal of select millwork, removal of select gypsum and suspended acoustic ceilings, removal of select soffits, removal of select plumbing fixture and plumbing accessories, removal of select light fixtures, removal of select exterior EFIS, removal and replacement of select exterior doors within the existing opening, new construction of select interior non-bearing walls to create office areas, a configuration room, a customer lounge and a coffee break area, select new door/door frames, select new suspended acoustic and gypsum ceilings, select new light fixtures, new plumbing fixtures and accessories in the accessible restrooms for the disabled, select new exterior aluminum composite panel, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Sprinklers used for area increase. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/10/20185/11/20185/11/2018PPASS
DetailsTroy Cobbley
Permit finaled

Jim Baker is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in3/1/20183/2/20183/2/2018APASS
DetailsTroy Cobbley
Rough-in passed. Piping can be covered.


Jim Baker is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus