INSP-Final Inspection | 2/8/2019 | 2/8/2019 | 2/8/2019 | P | PASS |
Jim Page
|
|
|
Final inspection for AES communicator complete.
Please call with notice so that we can meet inspector. Phone #: ###-#### Inspection requested via web by Bill Harmon
|
INSP-Final Inspection | 2/6/2019 | 2/7/2019 | 2/7/2019 | A | FAIL |
Jim Page
|
|
|
Shielded wire not used on the install, per installation requirements shielded wire is required. Provide as builts showing that the AES is wired directly through to the panel and not through the DSC.
call for acess about 30 mins -Bill Phone #: ###-####
|
INSP-Final Inspection | 2/4/2019 | 2/5/2019 | 2/5/2019 | A | FAIL |
Jim Page
|
|
|
Need to provide city approved documentation.
Bill-can you please call 1 hour prior to meet for access Phone #: ###-####
|