INSP-Final Inspection | 2/14/2020 | 2/21/2020 | 2/21/2020 | A | PASS |
Troy Cobbley
|
|
|
Permit finalede.
Peter will be onsite at 8:00 please Phone #: ###-#### Inspection requested via web by Fire Scheduler
|
INSP-Alarm Testing | 2/4/2020 | 2/5/2020 | 2/5/2020 | A | FAIL |
Troy Cobbley
|
|
|
No testing performed. The smoke detectors need to be relocated as discussed due to the concrete T construction causing obstructions to the smoke detectors. Spacing and function of the detectors to meet NFPA 72 21.3
Elevator Recall Final Phone #: ###-#### Inspection requested via web by Fire Scheduler
|