INSP-Final Inspection | 7/27/2018 | 7/30/2018 | 7/30/2018 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Adam Chitwood Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Sprinkler Rough-in | 7/27/2018 | 7/27/2018 | 7/27/2018 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations marked "ok" where piping is ok for cover.
Adam Chitwood Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Sprinkler Rough-in | 6/5/2018 | 6/5/2018 | 6/5/2018 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping on west side of lobby remodel complete, approved for cover.
Adam Phone #: ###-####
|
INSP-Sprinkler Rough-in | 5/29/2018 | 5/30/2018 | 5/30/2018 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping/pendant heads on the west side of the remodeled main entry complete, approved for cover.
Adam Phone #: ###-####
|