INSP-Final Inspection | 6/14/2018 | 6/14/2018 | 6/14/2018 | P | PASS |
Jim Page
|
|
|
Final inspection for AES communicator complete.
Peter is available to meet Jim to do the final no later than 2:00 pm. (He has an appt in Nampa at 3:00.) Plz call ###-#### for a 30 minute lead time to make sure Peter can meet Jim on time at the location. Phone #: ###-#### Inspection requested via web by Laura Tyson
|
INSP-Final Inspection | 4/5/2018 | 4/5/2018 | 4/5/2018 | P | FAIL |
Jim Page
|
|
|
AES communicator was showing trouble at time of inspection.
|
INSP-Final Inspection | 4/3/2018 | 4/5/2018 | 4/5/2018 | A | FAIL |
Jim Page
|
|
|
No phone number provided for technician to accomplish inspection, called phone number provided ###-#### at 8:45 AM and recieved a message that the call was made after normal business hours.
|