INSP-Final Inspection | 11/1/2018 | 11/1/2018 | 11/1/2018 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
Contact Scotty Powada ###-#### 30 min prior to Fire final Insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in/Hydro | 8/16/2018 | 8/16/2018 | 8/16/2018 | P | PASS |
Troy Cobbley
|
|
|
The underground hydro test passed
|
INSP-Sprinkler Rough-in | 8/15/2018 | 8/16/2018 | 8/16/2018 | P | CANC |
Troy Cobbley
|
|
|
Contact Scott Powada ###-#### 30 min prior to UG RTC Insp start please, we''ve scheduled a OH RTC insp for the same afternoon please con-inside.
Thanks Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|
INSP-Supply line flush | 8/7/2018 | 8/7/2018 | 8/7/2018 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed
|
INSP-Sprinkler Rough-in | 5/9/2018 | 5/10/2018 | 5/10/2018 | P | PASS |
Troy Cobbley
|
|
|
The underground supply piping is ok for cover.
|