INSP-Final Inspection | 6/14/2018 | 6/15/2018 | 6/15/2018 | P | PASS |
Jim Page
|
|
|
Previously noted items have been completed, final fire alarm inspection for area of work complete.
Call prior to going Phone #: 2086810381 >> Inspection requested via mobile web by Doug Lessa
|
INSP-Final Inspection | 6/6/2018 | 6/13/2018 | 6/13/2018 | A | FAIL |
Troy Cobbley
|
|
|
For todays inspection I verified FACP, NAC panels, phone lines, Corridor smoke and Corridor notification spacing. We also set off the notification circuits. I noted that notification will need to be added in two areas. Several devices have been added and another deleted but are shown on the on site as-builts. No initiating devices have been tested. CO detectors may need to be relocated 3' from fan blades Several smoke detectors do need to be relocated more than 3' from diffusers.
Call prior to going Phone #: ###-#### >> Inspection requested via mobile web by Doug
|