INSP-Final Inspection | 8/31/2018 | 9/4/2018 | 9/4/2018 | P | PASS |
Jim Page
|
|
|
Final commercial hood fire suppression system inspection complete.
Dave Phone #: ###-####
|
INSP-Final Inspection | 8/24/2018 | 8/24/2018 | 8/24/2018 | P | CANC |
Jim Page
|
|
|
Cancelled per conversation with point of contact, inspection will be rescheduled for a later date.
Dave Phone #: ###-####Dave Phone #: ###-####
|